Imperial War Museum (North)
Work Carried out: Maintenance Client: Sir Robert McAlpine
CAS Ltd were contracted to carry out an inspection of all fixings in the Air shard of the Imperial War Museum (North). Works consisted of accessing all internal areas and checking the torque setting of approximately 2000 nuts and bolts.
Any fixings failing to meet the appropriate criteria were replaced with new.
All works were carried out during nights to prevent any loss of custom to the museum. The contract was completed on a fixed price basis ahead of schedule. |