
As a result of a gear box issue a small spill of oil down the turbine tower was detected.
It required a rapid response by 3 of our senior IRATA Level 3 and just over 900 miles of travelling. However as a result the turbine was back on grid within 48 hrs.
More information on our Wind sector works can be found here.